2024, 10, v.40 239-243
考虑全生命周期的电力企业复杂多级项目进度监控方法
基金项目(Foundation):
邮箱(Email):
DOI:
发布时间: 2024-10-20
出版时间: 2024-10-20
移动端阅读
摘要:

社会对电力能源需求的不断增加,致使电力企业项目规模不断加大,项目结构也愈加复杂,为项目进行与完成增加了困难,这就对项目进度监控提出了更高的要求,故研究考虑全生命周期的电力企业复杂多级项目进度监控方法。深入分析项目进度监控与全生命周期之间的关系,搭建电力企业复杂多级项目进度监控框架,以此为基础,建立项目进度工作分解结构模型,构造项目进度监测结果计算公式,确定进度值与权重系数衡量方式,获取最终的项目进度监测结果,计算其与既定计划之间的偏差,制定相应电力企业复杂多级项目进度控制程序,从而实现项目进度的监测与控制。实验结果表明,该方法通过14 d将项目进度调整为与既定计划一致,并且后续一直保持此种状态,充分证实了该方法进度监控效果更佳。

Abstract:

The continuous increase in social demand for electricity energy results in an increase in the scale of power enterprise projects and complex project structure, which causes great adverse effects on project progress and completion. It also puts forward higher requirements for project progress monitoring. Therefore, a complex multi-level project progress monitoring method for power enterprise considering the whole life cycle is proposed. This paper deeply analyzes the relationship between project progress monitoring and the whole life cycle, and builds a complex multi-level project progress monitoring framework for power enterprise. Based on this, this paper establishes a project progress work breakdown structure model, constructs calculation formulas for project progress monitoring results, determines the measurement method for progress values and weight coefficients, obtains the final project progress monitoring results, calculates their deviation from the established plan and develops corresponding complex multi-level project schedule control procedures for power enterprise to achieve monitoring and control of project progress. The experimental results show that the method adjusts the project schedule to be consistent with the established plan by 14 d and maintains this state continuously, which fully confirms that the proposed method has better progress monitoring effect.

参考文献

[1] 廖小烽,谢艳,田书函,等.基于计算机视觉的施工进度自动监控方法[J].重庆大学学报,2022,45(S1):70-73.

[2] 张玉琢,张赫,王庆贺,等.基于BIM和PDCA理论的大型综合体项目进度管控研究[J].建筑科学与工程学报,2022,39(4):183-191.

[3] YAN X Z,ZHANG H,ZHANG W Y.Intelligent Monitoring and Evaluation for the Prefabricated Construction Schedule[J].Computer-Aided Civil and Infrastructure Engineering,2023,38(3):391-407.

[4] WEI W,LU Y J,ZHONG T,et al.Integrated Vision-based Automated Progress Monitoring of Indoor Construction Using Mask Region-based Convolutional Neural Networks and BIM[J].Automation in Construction,2022,140:104327.

[5] 韩周平,韩诗雨.工程总承包项目进度计划编制探讨[J].煤炭工程,2022,54(9):31-34.

[6] 初智杰,刘洋,蔚志存.中小型机场航站区施工组织及进度控制研究[J].建筑技术,2023,54(8):982-986.

[7] 崔瑾,张春凤,王志杰,等.厦门第二东通道项目监控系统方案研究[J].公路,2022,67(11):36-39.

[8] 胡成辉,陈海龙,黄叶.基于系统动力学的工程项目进度建模仿真研究[J].土木工程与管理学报,2023,40(1):40-47.

[9] 王淑苹,冯为民,黄良辉,等.约束条件下基于改进免疫算法的项目工期进度优化[J].南京理工大学学报,2023,47(5):685-691.

[10] 张俊光,沈正凡.基于资源冲量的关键链项目缓冲监控方法[J].科技管理研究,2023,43(9):191-196.

[11] 陈远,金蕊,查亚闯.基于贝叶斯网络的大型公共项目进度延误风险研究[J].郑州大学学报(工学版),2022,43(2):91-97.

[12] 王照安,赵恒,李彭.建筑工程施工管理与进度控制措施分析[J].工业建筑,2023,53(7):后插11.

[13] 王庆贺,刘瑞鑫,孙立晔,等.BIM与云、物联网技术在桥梁全生命周期中的研究及应用[J].铁道标准设计,2022,66(12):78-83.

基本信息:

中图分类号:TM73

引用信息:

[1]曹青,陈文平,吴大忠.考虑全生命周期的电力企业复杂多级项目进度监控方法[J].微型电脑应用,2024,40(10):239-243.

发布时间:

2024-10-20

出版时间:

2024-10-20

检 索 高级检索

引用

GB/T 7714-2015 格式引文
MLA格式引文
APA格式引文